Mac Dill AFB



Working for the design architect, our firm was part of the design build construction team selected to provide additional housing for the base staff. Coordinating closely with the design architect and contractor, a low cost energy efficient design was utilized using Heat Pump Units with desuperheaters for hot water waste heat recovery.