Central Valley High school

Ceres, CA

This new High School campus opened for the 2005-2006 school year. The campus mechanical system consisted of a central plant system with (2) 244-TON air-cooled screw chillers and (3) 2 million BTU boilers. Additional space was designed into the central plant to provide for the future expansion of an auditorium and additional classroom wings. Fabric duct systems were used in several of the buildings to provide cost savings and blend in with the architecture.