Sacramento, CA
The new school is a replacement campus for the original 70-year-old Dyer-Kelly Elementary School. The new campus, delivered in the design-build delivery method, is a two-story, single building constructed adjacent to the existing, occupied site. Safety and security are enhanced by a single building. Learning neighborhoods provide both classroom space and flexible breakout areas for project-based learning, intervention programs and informal gathering.
LP Consulting Engineers role was designing the electrical systems and coordinating closely with the architect and design build contractor for a well-coordinated, on-time 12 month delivery for 2019/2020 school year enrollment.